Dalarna University's logo and link to the university's website

du.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Avvikelsehantering under produktionsskedet i byggprojekt: En studie kring hur avvikelsehantering ser ut och hur den kan effektiviseras med hjälp av BIM
Dalarna University, School of Information and Engineering.
Dalarna University, School of Information and Engineering.
2023 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Syftet med denna studie är att utreda hur ett stort byggföretag i norra Sverige hanterar eventuella fel som upptäcks på byggplatsen i produktionsskedet, och hur denna erfarenhetsåterföringsprocess kan effektiviseras. För att besvara studiens syfte ställdes följande frågeställningar upp:

 Hur går en stor aktör i byggbranschen till väga när de upptäcker ett fel på byggplatsen som kräver en revidering av ritning/modell?

 Hur kan en stor aktör i byggbranschen effektivisera sin erfarenhetsåterföringsprocess vid produktionsskedet för att förebygga att eventuella fel återkommer?

Studien tar även upp tidigare forskning kring BIM, vad det är och hur det används, andra digitala hjälpmedel samt vad som innebär med erfarenhetsåterföring och ändrings-PM. Rapporten ger även en inblick i vad som menas med kvalitet och olika typer av kvalitetsarbete.

För att besvara studiens frågeställningar och syfte så har en intervjustudie genomförts på ett stort byggföretag där samtliga respondenter har varit placerade på projekt som är geografiskt belägna i norra Sverige. I rapportens resultatdel presenteras en sammanställd version av intervjustudien som sedan diskuteras i studiens diskussionskapitel. Resultatet visar att företagets arbete med erfarenhetsåterföring kan förbättras samt att arbetsprocessen inte ser likadan ut på samtliga byggarbetsplatser. I rapportens diskussionsdel presenteras ett flertal förslag på åtgärder och förbättringar som kan nyttjas av företaget för att effektivisera sin erfarenhetsåterföringsprocess samt för att motverka att specifika fel återkommer. Ett utdrag av de lösningar som presenteras är att företaget kan arbeta mer med ständiga förbättringar, vara mer noggranna med uppföljningsmöten och slutmöten, tillämpa mer kontakt mellan projektansvariga samt utföra ett mer grundligt arbete med 3D-modellen. 

Abstract [en]

The purpose of this study is to investigate how a big construction company in the north region of Sweden manage possible errors that occurs during the production, and how the process of experience transfer can improve. To answer the purpose of this study, the following research questions was asked:

 How does a large perator in the construction sector, located in the north region of Sweden, act when an error is discovered and requires a revision of blueprint/model?

 How can a large perator in the construction sector, located in the north region of Sweden, increase their experience transfer during the production to prevent recurring errors?

The study also includes previous research regarding BIM, what it is and how it is used, other digital assistive technologies and what experience transfer and modification-PM means. The report also consists of an explanation of quality and different quality methods.

To answer the studies research questions and purpose, an interview survey has been carried out on a big construction company where all of responders have been in projects in the specific region. In the result, a summary of the interview study is presented and discussed in the analyze and discussion part. The work with experience transfer in the company can be improved according to the result, it also shows that standard processes can be different between various workplaces. In the discussion part, a few possible actions and improvements are presented to help the company with transfer of experience and reoccurring errors. Long-term improvement work, more focus on follow-up meetings and final meetings, better contact between project managers and more thorough work on the 3D-model are a couple of suggestions from the writers. 

Place, publisher, year, edition, pages
2023.
Keywords [en]
BIM, transfer of experience, revision, build-up of knowledge, digression, deviation management
Keywords [sv]
BIM, erfarenhetsåterföring, revideringar, kunskapsuppbyggnad, avvikelser, avvikelsehantering
National Category
Construction Management
Identifiers
URN: urn:nbn:se:du-46431OAI: oai:DiVA.org:du-46431DiVA, id: diva2:1781940
Subject / course
Construction
Available from: 2023-07-11 Created: 2023-07-11

Open Access in DiVA

fulltext(1453 kB)113 downloads
File information
File name FULLTEXT01.pdfFile size 1453 kBChecksum SHA-512
626af40a1984b0905cc9bae82b2b478adac481d1cf1c1939e60522f144652a85d5e4ef18a623e2385c578955b4efebf7ca714e26f275068f1766922dcd6a43fc
Type fulltextMimetype application/pdf

By organisation
School of Information and Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 113 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 237 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf