Dalarna University's logo and link to the university's website

du.sePublications
Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utfackningsväggar i trä: En tid- och kostnadsjämförelse mellan prefabricerade och platsbyggda byggmetoder
Dalarna University, School of Technology and Business Studies, Construction.
2014 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Curtain walls in wood : A time and cost comparison between prefabricated and site-built construction methods (English)
Abstract [sv]

För att vinna upphandlingar idag är det viktigt som entreprenör att välja de effektivaste och resurssnålaste produktionsmetoderna. Att redan i kalkylskedet ta ställning till hur hög prefabriceringsgrad projektet bör ha är av stor vikt för att tidigt kunna anpassa sin arbetsplats för att få bästa möjliga produktion.

I Mora har Skanska en blockverkstad där det bland annat sker en tillverkning av utfackningsväggar. Skanska har uttryckt en önskan om en undersökning av skillnaderna i tid och kostnad mellan deras prefabricerade utfackningsväggar och platsbyggda utfackningsväggar. Detta för att kunna urskilja vilka byggprojekt som kan vara lämpliga för att använda sig av deras prefabricerade utfackningsväggar.

Syftet med detta examensarbete är att underlätta vid valet av produktionsmetod för tillverkning av utfackningsväggar, beroende på byggprojektets förutsättningar gällande:

  • Om projektet har en kort eller lång tidsplan.
  • Hur många kvadratmeter utfackningsvägg projektet behöver.
  • Avstånd till blockverkstad.

Arbetet är avgränsat till att omfatta byggprojekt som har en bärande stomme med lätta utfackningsväggar av trä. De produktionsmetoder som studerats för att bygga utfackningsväggar i trä är prefabricering och platsbyggt.

Kostnaden för tillverkning av utfackningsväggar avgränsas till endast ta med arbetskostnad samt omkostnader, det vill säga att inga kostnader för de inbyggda materialen är medräknade. Kostnaden för de inbyggda materialen antas i detta arbete vara de samma oavsett om utfackningsväggen är platsbyggd eller prefabricerad.

Med enhetstiderna från blockverkstaden har en tillverkningstid för prefabricering av utfackningsväggar tagits fram. För den platsbyggda utfackningsväggen har enhetstider från Nybyggnadslistan 1999 hämtats och använts för att beräkna en tillverkningstid för att bygga väggen på plats. Med hjälp av tillverkningstiderna har en tillverkningskostnad tagits fram för de olika produktionsmetoderna. Med hjälp av tillverkningskostnaderna har en lönsamhetberäkning gjorts.

Lönsamhetsberäkningen ska visa hur stor mängd väggarea som krävs för att det ska vara mer lönsamt att välja prefabricerade utfackningsväggar än att platsbygga utfackningsväggarn.

Resultatet visar att tillverkning och montering av en kvadratmeter prefabricerad utfackningsväggar tar 0,135 timmar mindre tid än att platsbygga samma mängd. Tid på byggarbetsplatsen minskas med 0,578 timmar per kvadratmeter vid användande av prefabricerade utfackningsväggar.

Resultatet visar också att kostnaden för att tillverka och montera en kvadratmeter utfackningsvägg är 32,77 kr lägre än att platsbygga samma mängd utfackningsvägg. Det som drar upp kostnaden för prefabricerade utfackningsväggar är transporten. En fullastad lastbil med 370 m² vägg kan transporteras 43 mil innan lönsamhetstaket är uppnått.

Vid användande av prefabricerade utfackningsväggar minskas tiden på arbetsplatsen. Vilket medför minskade omkostnader på arbetsplatsen.

För ett byggobjekt som ligger på ett avstånd av 30 mil från blockverkstaden, så är det lönsamt att välja prefabricerade utfackningsväggar om projektet behöver minst 256 m² utfackningsvägg. För byggprojekt som kräver ett mindre antal kvadratmeter utfackningsväggar är det mer lönsamt att använda sig av platsbyggda utfackningsväggar. Speciellt om byggprojektet ligger på ett långt avstånd från blockverkstaden.

Viktiga slutsatser från detta examensarbete är:

  • Kortare tillverkningstid för prefabricerade utfackningsväggar, vilket medför en lägre tillverkningskostnad.
  • Tiden på byggarbetsplatsen minskas vid användandet av prefabricerade utfackningsväggar.
  • Vid långa transporter krävs ett större antal kvadratmeter prefabricerade utfackningsväggar för att användandet av prefab ska vara lönsamt.
  • Användandet av prefabricerade utfackningsväggar medför ett mindre behov för förvaring av material på byggarbetsplatsen.
Abstract [en]

To win procurements today, it is important that you as an entrepreneur choose the most effective resource and production methods. That already in the calculation stage, decide how high degree of prefabrication the project should have, is favorable to promptly adapt the workplace in order to get the best output.

In Mora, Skanska has a block workshop that among other things manufactures curtain walls. Skanska has expressed a desire for a study of the differences in time and cost between their precast curtain walls and site-built curtain walls in order to see for which construction projects it may be appropriate to make use of their precast curtain walls.

The purpose of this project is to facilitate the choice of production method for the manufacture of curtain walls, depending on the construction project's requirements regarding:

  • If the project has a short or long timetable.
  • How many square meters of curtain-wall the project needs.
  • Distance to block workshop.

The work is defined to include construction projects that have a bearing frame with lightweight curtain walls of wood. The production methods studied for building curtain walls in wood is prefabrication and site-built.

The production cost has defined to only conclude the cost of the work and the expenses of the workplace, no costs for the materials that are built-in are included. The cost of the built-in materials is assumed in this work to be the same whether the curtain walls are site built or prefabricated.

With unit times from the block workshop, has a production time for prefabrication of curtain walls been calculated. For the site-built curtain wall, unit times from Nybyggnadslistan 1999 has been retrieved and used to calculate a manufacturing time for building the wall in place. A cost benefit analysis has been done comparing the different manufacturing cost. The cost benefit analysis show the amount of wall area required to choose prefabricated over place built at the highest profit.

The result shows that to manufacture and mount one square meter of prefabricated curtain wall takes 0,135 hours less time than that place build the same amount. Time on site is reduced by 0,578 hours per square meter when using precast curtain walls.

The result also shows that the cost to manufacture one square meter of curtain-wall is 32.77 SEK lower than that place build the same amount of curtain-wall. The thing that pulls up the cost of precast curtain walls is the transport. A fully loaded truck with 370 m² of wall can be transported 43 Swedish miles before profitability ceiling is reached.

The time at the construction place, is getting shorter when using prefabricated curtain walls, leading to reduced costs in the workplace.

For a construction project located at a distance of 30 Swedish miles from block workshop, is it profitable to choose prefabricated curtain walls, if the object needs 256 m² or more square meters of wall. For construction projects that require a smaller number of square meters of curtain walls, it is more profitable to use the site-built curtain walls. Especially if the construction project is located at a far distance from the block workshop.

Important conclusions from this thesis are:

  • Shorter production time for precast curtain walls, which results in a lower production cost.
  • The time on the construction site is reduced by the use of precast curtain walls.
  • For long trips, a larger number of square meters precast curtain walls is needed to make the use of prefab to be profitable.
  • The use of precast curtain walls means less need for storage of materials on the construction site.
Place, publisher, year, edition, pages
2014.
Keywords [en]
Curtain wall; time; cost, prefabricate, site-built.
Keywords [sv]
Utfackningsvägg; tid, kostnad, prefabricering, platsbyggnation
National Category
Construction Management
Identifiers
URN: urn:nbn:se:du-14643OAI: oai:DiVA.org:du-14643DiVA, id: diva2:732227
Available from: 2014-07-03 Created: 2014-07-03 Last updated: 2014-07-03Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Construction
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 1642 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf