Dalarna University's logo and link to the university's website

du.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Villa Tvärnö - ett ekologiskt småhus: Implementering av ekologiska installationssystem i modern hållbar villa.
Dalarna University, School of Information and Engineering.
Dalarna University, School of Information and Engineering.
2021 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Implementation of ecological installation systems in a modern sustainable house. (English)
Abstract [sv]

Det här examensarbetet har undersökt vilka installationssystem som anses vara karaktäristiskaför ekologiskt byggande. Arbetet bygger på en fallstudie där syftet är att utreda möjligheternaatt implementera ekologiska installationssystem i en befintlig hållbar villa och studera dessutfall och konsekvenser. Studieobjektet som har valts, är en modern villa. Interiört synsstommen av korslimmade träelement (KL-trä) och där med erhåller inget installationsskikt.Designprocessmetoden som används i denna uppsats har fyra steg. Dessa steg har gjorts icykler i flera omgångar och även körts parallellt ett antal gånger för att komma fram till enslutsats.Det som varit viktigt i processen, var att behålla så mycket som möjligt ur den ursprungligavillans utformning och arkitektur samtidigt som installationssystemens samverkan ochfunktion har optimerats.Resultatet redovisas i form av designprocessen, från steg ett till tre, och illustreras i bilder/skisser och mindre texter. Slutsatsen redovisar ett alternativ, där installationssystemensplacering, utfall och konsekvenser har utvärderats. Kompromisser har gjorts mellan dem,vilka lett till prioriteringar som värderats högst utifrån ovanstående kriterier, där även detekniska och funktionsmässiga aspekterna ingick. Ambitionen har varit att behålla villansursprungsdesign i högsta mån. Det slutgiltiga alternativet som redovisas har dimensioneratsmed schablonmässiga beräkningar. Ett av målen med examensarbetet var att erhålla en villamed så lite miljöbelastning som möjligt, och även ge en grund till ett framtida villakonceptdär energi och resursförbrukning ligger i fokus och går i linje med ekologiskt byggande. Iresultatet förses villan med en massugn som avger värme jämnt under lång tid och samverkarmed solvärme som tillsammans värmer en ackumulatortank. Värmen distribueras genomtermitventilationens kanaler och golvvärme i halva byggnadens bottenvåning. Regnvattnetsåtervinningssystem besparar vattenförbrukningen med cirka 86 kubik/år, toaletter, tvättmaskinoch utedusch är inkopplat på detta system.

Abstract [en]

This thesis has investigated which installation systems are considered characteristic ofecological construction. The work is based on a case study where the purpose is to investigatethe possibilities of implementing ecological installation systems in an existing sustainablehouse and study its outcome and consequences. The chosen study object is a modern house. Inthe interior, the frame is made of cross-laminated wooden elements (KL-wood) and, therefore,no installation layer is obtained.The designprocessmethod used in this dissertation has four steps. These steps have been donein cycles in several rounds and also run in parallel a number of times to reach a conclusion.What was important in the process was to retain as much as possible from the design andarchitecture of the original house while optimizing the collaboration and function of theinstallation systems.The results are reported in the form of the designprocess, from steps one to three, and areillustrated in pictures/sketches and short texts. The conclusion presents an alternative, wherethe location, outcome and consequences of the installation systems have been evaluated.Compromises have been made between them, which have led to priorities valued highly onthe basis of the above criteria, which also included the technical and functional aspects. Theambition has been to keep the originaldesign of the house to the highest degree. The finalalternative that is reported has been dimensioned with standard calculations. One of the goalsof the project was to obtain a house with as little environmental impact as possible, and alsoprovide a basis for a future house concept where energy and resource consumption are infocus and in line with ecological construction. In the result, the house is equipped with a solidbrick fireplace that emits heat evenly for a long time and interacts with solar heat that togetherheats an accumulator tank. The heat is distributed through the termite ventilation ducts andunderfloor heating in half of the building's ground floor. The rainwater recycling system saveswater consumption by approximately 86 cubic meters/year, where flushing of toilets, washingmachine and outdoor shower is connected to the system.

Place, publisher, year, edition, pages
2021.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:du-38145OAI: oai:DiVA.org:du-38145DiVA, id: diva2:1595046
Subject / course
Construction
Available from: 2021-09-17 Created: 2021-09-17

Open Access in DiVA

No full text in DiVA

By organisation
School of Information and Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 239 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • chicago-author-date
  • chicago-note-bibliography
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf